


The pole manufacturer Europoles, based in Neumarkt, Germany, started to operate a highly advanced factory for building laser welded steel poles in Poland supplied by Soutec AG. The factory complex has been equipped with the latest in technology. The technological core of the architecturally sophisticated complex is an ultramodern, fully automated process for conical steel poles that enables production of a new generation of poles.
The CO2 emissions for production of the steel poles will fall by at least 30% with respect to previous manufacture – with significant enhancement at the same time in quality and durability of the final product.